Majorna Apartment Modernisation
Majorna, Göteborg · 2024
Whole-building refurbishment of a landshövdingehus — new services, twelve rebuilt wet rooms and a repaired timber façade, with tenants in place.
A housing association owned a three-storey landshövdingehus — masonry ground floor, timber above — that had not been touched structurally since the 1980s. Wet rooms were failing, the electrical supply was undersized and the façade was letting in water at the eaves.
Northstone re-wired all twelve apartments, rebuilt every bathroom to GVK standard, replaced the stair-core windows with timber copies, and repaired the cladding and eaves where rot had taken hold.
Nine of the twelve households stayed in their flats. We worked one stack at a time, moved residents into a furnished guest flat for the ten days their bathroom was out, and kept a fixed daily quiet period.
The building came out with new certificates, a fresh façade and forty more years in it — without a single tenant having to move out permanently.
Services on this project
Gallery
Next step
Tell us what you're planning. We'll visit the site, talk through scope and budget honestly, and send you a written summary within a week — at no cost.