The questions we hear most often, grouped by topic. If yours isn’t here, ask us directly — we’ll add it.
General
What areas do you work in?
Gothenburg and the surrounding municipalities — including Mölndal, Partille, Kungälv, Härryda and the southern archipelago islands. For projects outside a roughly 40-kilometre radius we take on management and specialist joinery only.
How big a project do you take on?
From a single fitted kitchen up to buildings of around 3 000 m². Below about 150 000 kr we usually point you to a smaller local firm — you will get a better price and a faster start.
Do you do design as well as construction?
Yes. Our in-house studio can take a residential project from first sketch through building permit to completion (design and build). We also work happily as construction-only contractor to an architect you have already appointed.
Are you insured and certified?
We carry contract-works and third-party liability insurance, are ID06 registered, and hold BF9K certification for quality, environmental and work-environment management. We are members of Byggföretagen. Documentation is available on request.
Do you build prefabricated houses?
Yes. We offer four factory-built timber models — Skerry 68, Birch 96, Fjord 128 and Horizon 164 — in three packages: weathertight shell, interior finished and turnkey. The elements are made in our factory, delivered by lorry and craned onto your foundation. See the Prefab Houses page for full specifications.
Process
What happens at the first meeting?
We visit the property, discuss what you want to achieve and your budget, and look at any constraints — access, structure, permits. Within a week you receive a written summary with an indicative price range and timeline. There is no charge for this.
Who is my point of contact during the build?
One named site manager. They run the trades, the deliveries and the inspections, and send you a weekly report with photos, progress against the programme and cost status. You are welcome on site whenever you like, by arrangement.
Can I stay in the building while you work?
Often, yes. On apartment and house renovations we build dust walls, protect access routes, agree quiet hours and phase the work so rooms come back into use as they finish. For full-house projects with the kitchen and only bathroom out of action at once, most clients move out for that period.
Do you handle the building permit?
On design-and-build projects, yes — we prepare and submit the bygglov application and represent you at the technical consultation (tekniskt samråd). On construction-only contracts your architect normally holds this and we support it.
Pricing
Why can't you give a fixed price on the phone?
Construction cost depends on structure, access, ground conditions, the state of what is already there and the finishes you choose. A number given without drawings is a guess, and guesses turn into disputes. We give an indicative range early and a firm price against a defined scope.
How are payments structured?
Against milestones defined in the contract — for example: contract signing, weathertight shell, first fix complete, second fix complete, handover. You pay for work that is in place and signed off. We do not ask for large payments up front.
Can I use ROT-avdrag?
For renovation and interior work on a home you own, yes — the ROT deduction covers 30% of labour, up to the annual cap per person. We apply it directly on your invoice and handle the claim with Skatteverket. It does not apply to new-build houses in their first five years.
What is included in your indicative m² figures?
The ranges on our pricing page cover construction labour and materials to a mid-range specification. They exclude VAT, design fees, permit charges, connections to municipal services, kitchens and loose furniture, and any groundworks beyond a normal plot.
Is the foundation included in the prefab house price?
No. Prefab prices cover the house itself, delivery within 250 km of Gothenburg and crane assembly. A slab-on-ground foundation with drainage and service connections can be added as an extra when you order, or you can use your own groundworks contractor to our drawings.
Timeline
How far ahead are you booking?
Typically two to four months for main construction, shorter for interior and joinery-only commissions. Design work can usually start within a few weeks of appointment, which means the permit is often in hand by the time a site slot opens.
How long does a typical project take?
A bathroom rebuild is two to three weeks; a full apartment renovation two to four months; a rear extension six to eight months; a new house twelve to sixteen months from contract to handover. Your programme is set out week by week before work starts.
What happens if the project runs late?
The contract sets a completion date and the terms around it. If a delay is ours, that is our cost. If it is caused by a client change or something genuinely unforeseeable — rock where drawings showed soil, say — we agree an adjustment in writing before it affects the programme.
How long does a prefab house take from order to move-in?
Allow 8–14 weeks in the factory depending on the model, one to two days for crane assembly, and about a week to close the house in. Interior-finished and turnkey houses are typically ready four to eight weeks after delivery. Permit and foundation work run in parallel with factory production.